CIRS

Our Process

A repeatable path from a building that is making someone sick to one they can live in — investigate, plan, remediate, rebuild, verify.

01 — Investigate

Forensic moisture investigation across the whole building as a system. We find active and historic water, the pathways, and the materials affected — before anyone swings a hammer.

02 — Plan

A remediation and reconstruction plan written to the CIRS-MIR standard and coordinated with the patient’s physician and IEP, so everyone is building to the same threshold.

03 — Remediate

Containment and removal done for a sensitized occupant — verified, documented, and held to the plan rather than to a general spec.

04 — Rebuild

Reconstruction with materials, detailing, and mechanicals chosen for indoor health, so the rebuild does not reintroduce the problem.

05 — Verify

Post-work verification that the space performs, with documentation the medical team and the owner can rely on.

Let’s Talk

Questions about your building?

We work alongside physicians and indoor environmental professionals. Tell us where you are in the process.